Pit Mounted
A pit is excavated to accommodate the size of the weighbridge.
The pit walls and floor is casted with reinforced concrete.
Block foundation is casted with reinforced concrete on the pit floor to accommodate the loadcells of the weighbridge.
The weighbridge is installed into the pit to be level with the surrounding surface and all installed components is under the weighbridge deck/s to allow free movement on the weighbridge deck/s.
The weighbridge can be accessible for maintenance through a manhole either on the side of the pit of through a manhole in the weighbridge deck depending on the customer’s needs.
Pit mounted installations is beneficial when there is not sufficient area around the weighbridge for access ramps to the weighbridge and generally insufficient area around the weighbridge.